A Spanish Immersion Elementary School constructed for the Bellevue School District.
This all-new, 97000 sf school was constructed with over 790 tons of steel and required nearly 58000 inches of welding. CHG erected and installed the structural steel, buckling restrained braces, open web steel joist framing, steel decking, metal stairs, and metal railings.