CHG worked with Patriot Construction to build an addition to the university’s historic Memorial Field house while parts of the facility remained open. The CHG team installed 175 tons of structural steel, adding 31,500 square feet to the. In addition to updates to the 1940’s vintage field house, this project added a fitness center and Olympic-size aquatic center. CHG’s work also included insulated metal wall panels and architectural sheet metal. Working on the busy campus required extensive planning, safety measures and coordination with other trades during construction.

 

The CHG team was lead by Mike MacDonald and Steve Grouws for this addition to an existing building on the UPS campus. The team installed 175 tons of structural steel, adding 31,500 square feet to the Puget Sound Memorial Field House. In addition to updates to the 1940’s vintage field house, this project added a fitness center and Olympic-size aquatic center. CHG’s work also included insulated metal wall panels and architectural sheet metal. Parts of the facility remained open during construction. Working on the busy campus required extensive planning, safety measures and coordination with other trades during construction.

For a timelapse video of the project go to: http://www.wapatriot.com/projects/university-of-puget-sound-athletics-aquatics-center/

CHGGradeBar1
Abc03WestWaLogo4c
AuthorizedBuilderJPG
Abc03WestWaLogo4c1
CHGblue
AuthorizedBuilderJPG1
HomehomeOverStructural SteelStructuralOverPre-engineered BuildingsPreEngOver1Seismic RetrofittingSeismicOverArchitectual Sheet MetalArchitecturalOverRetrofit Roof SystemsArchitecturalOver3Building RenovationBuildingOver1Additional ServicesOtherOver2VP BuildingsVpBuildingOver3