CHGblueNoBuildingSystems
CHGblueNoBuildingSystems
homeNormal
StructuralNormal
PreEngNormal1
SeismicNormal
ArchitecturalNormal
BuildingNormal1
OtherNormal2
VpBuildingNormal3
 


Bethel School District Transportation/Central Kitchen Design-Build

item2Working with BNBuilders, general contractor and Bassetti Architects, CHG installed two V-P pre-engineered buildings for the transportation center and central kitchen for the Bethel School District in Fredrickson, Wash. The two-story, 34,090-square-foot transportation building includes 10 bays of shop space, complete office and administrative support spaces for staff, parts and tool storage, plus a 2,688-square-foot bus wash.. The central kitchen building is a 24,563-square-foot building that includes freezers and coolers, a test kitchen and office space.

TacomaTransferexterior2DSC0778small 

TacomaTransferexterior1DSC0870medium 

CHGGradeBar1
featured1

Abc03WestWaLogo4c
AuthorizedBuilderJPG
Abc03WestWaLogo4c1
CHGblue
AuthorizedBuilderJPG1
HomehomeOverStructural SteelStructuralOverPre-engineered BuildingsPreEngOver1Seismic RetrofittingSeismicOverArchitectual Sheet MetalArchitecturalOverBuilding RenovationBuildingOver1Additional ServicesOtherOver2VP BuildingsVpBuildingOver3