CHGblueNoBuildingSystems
CHGblueNoBuildingSystems
homeNormal
StructuralNormal
PreEngNormal1
SeismicNormal
ArchitecturalNormal
m2
BuildingNormal1
OtherNormal2
VpBuildingNormal3
 


AAC Hangar and Operations Center at Joint Base Lewis McCord

item2 

TacomaTransferexterior2DSC0778small 

TacomaTransferexterior1DSC0870medium 

Working with Archer Western Federal JV, CHG installed 1,400 tons of structural steel for a 110,000 square-foot hangar and operations center. The multi-level operations center consisted of wide flange columns, beams, and steel deck. The hangar portion of the project incorporated long-span box steel construction and was complicated by the fact that there was no grade slab in place during steel erection. Providing a further logistic challenge, these areas were separated by a precast concrete firewall. CHG also installed the steel stairs and railings on the project.

CHGGradeBar1
Abc03WestWaLogo4c
AuthorizedBuilderJPG
Abc03WestWaLogo4c1
CHGblue
AuthorizedBuilderJPG1
HomehomeOverStructural SteelStructuralOverPre-engineered BuildingsPreEngOver1Seismic RetrofittingSeismicOverArchitectual Sheet MetalArchitecturalOverRetrofit Roof SystemsArchitecturalOver3Building RenovationBuildingOver1Additional ServicesOtherOver2VP BuildingsVpBuildingOver3